1 June 2020

Using technology to set business goals

Defining business end-goals and the cost / benefit of applying certain digital technologies, as well as the digitalization roadmap to follow through a digital transformation plan, are key to guarantee success for steel producers to achieve industry 4.0 and the digital factory of the future.
28 May 2020

Gerdau special steel mill back in operation

The Gerdau combined bar and wire rod mill in Charqueadas, Rio Grande do Sul, Brazil, has successfully returned to operations after the upgrade of the automation and drives. The commissioning was performed in 11 days during a programmed shutdown in March, 2020.
28 April 2020

How to set digital goals

Digital transformation is the vehicle, not the destination. How do you set business end goals in a world where everything, from people to processes is going digital?
24 April 2020

Outstanding results from new laser speed meters at CELSA Steel UK

Celsa Steel UK put into operation two Russula speed meters to improve the accuracy of the mill speed measurements for the two-strand rod mill in Cardiff, United Kingdom.
16 April 2020

ArcelorMittal Acindar and Russula upgrade both mills

The ArcelorMittal Acindar and Russula team performed automation and electrical hardware upgrades on both mills at the Villa Constitución site in Argentina.
2 April 2020

Chusovoy Metallurgical Works signs a contract for the supply of new equipment for the rolling mill expansion project

Chusovoy Metallurgical Works (JSC CMW, Perm Region, part of OMK) awards Russula (A, Coruña, Spain) a contract for the supply of the water treatment plant equipment as part of an expansion project to current rolling mill production.
18 March 2020

Russula update on Coronavirus response

Russula would like to take this opportunity to update our customers and stakeholders on the policies it has implemented to safeguard its employees and business operations from the threat of the COVID-19 (Coronavirus) outbreak.
11 March 2020

Cascade Steel awards Russula mill upgrade contract

In January 2020, Cascade Steel Rolling Mills awarded Russula a contract to upgrade the rod and bar mill in McMinnville, OR. This order follows a series of mechanical equipment supply, pass design, mill optimization and operational support projects that Cascade Steel and Russula have collaborated on over the years.
20 February 2020

Russula upgrades furnace drives at Gerdau Petersburg

Gerdau upgraded the reheat furnace drives of its structural steel mill, located in Petersburg, Virginia, USA. The purpose of the upgrade was to replace obsolete equipment with modern AC drives that removed bottlenecks and improved plant performance.
  • EN
  • ES