Projects

Mill Pulse® Manufacturing Execution System implementation at Celsa Nervacero
Celsa Nervacero is currently running the Mill Pulse® Delay Tracking and Production Management and Scheduling modules.

Projects
CSN two-strand slab caster automation and drives upgrade
In January 2023, the CSN and Russula team commissioned the second phase of the drives and automation upgrade for the continuous slab caster.

Projects

Advanced automation at Gerdau Pindamonhangaba improves special steel billets and heavy bar cooling
The partnership between Gerdau and Russula continues in the automation of the Rolling Mill #1 cooling bed that will improve the temperature cooling for the special steel billets and heavy bars.

Projects

Cooling Water Systems for Novelis
The cooling systems will serve the caster, hot mill, cold mill, and finishing line areas.

Projects
Big River Steel Works
BRSW has awarded Russula the construction of one of the largest water treatment plants ever built for the metallurgical sector. The water plant is divided into 13 circuits that treat daily more than 65M l/h.

Projects

Gerdau Charqueadas Phase 3 electrical upgrade
After the successful commissioning of Phases 1 and 2 of the automation and electrical upgrade at the SBQ combined bar and wire mill in Charqueadas, Brazil, the Gerdau and Russula team successfully put into operation Phase 3 on September 6, 2023.

Projects

Gerdau Cosigua Electrical & Automation Upgrade
The first phase includes replacing control equipment and drives, spanning from reheating furnace movements to reforming.

Projects

Russula supplies several optical alignment systems to steel plants
Russula has designed a novel guide alignment system based on artificial vision employing telecentric lenses, high-resolution cameras and Russula’s own artificial vision algorithms.

Flagship projects
2024Cooling Water Systems for Novelis
The cooling systems will serve the caster, hot mill, cold mill, and finishing line areas.
2024Reverse osmosis water system for Novelis
This strategic project enables Novelis to optimize water consumption and reduce its environmental impact
2024Gerdau Cosigua Electrical & Automation Upgrade
The first phase includes replacing control equipment and drives, spanning from reheating furnace movements to reforming.
2023Charqueadas, Rio Grande do Sul, BrazilGerdau Charqueadas Phase 3 electrical upgrade
After the successful commissioning of Phases 1 and 2 of the automation and electrical upgrade at the SBQ combined bar and wire mill in Charqueadas, Brazil, the Gerdau and Russula team successfully put into operation Phase 3 on September 6, 2023.
2023Charqueadas, Rio Grande do Sul, BrazilAdvanced automation at Gerdau Pindamonhangaba improves special steel billets and heavy bar cooling
The partnership between Gerdau and Russula continues in the automation of the Rolling Mill #1 cooling bed that will improve the temperature cooling for the special steel billets and heavy bars.
2023Bilbao, SpainMill Pulse® Manufacturing Execution System implementation at Celsa Nervacero
Celsa Nervacero is currently running the Mill Pulse® Delay Tracking and Production Management and Scheduling modules.
2019Bayonne, FranceRussula supplies 550,000 tpy wire rod mill
The start-up of the new rolling mill at the Celsa France complex in Bayonne allowed CELSA Group™ to further diversify its activity and boost its international business to invoice new growth as of next year.
2022Osceola, AR, USABig River Steel Works
BRSW has awarded Russula the construction of one of the largest water treatment plants ever built for the metallurgical sector. The water plant is divided into 13 circuits that treat daily more than 65M l/h.
2023Kingman, AZ, USANucor Kingman bar finishing mill upgrade
Obsolete automation and drives equipment will be replaced with new, modern, first line electrical equipment.
ARCHIVES
All our
projects
Russula Mill Control for 500,000 tpy wire rod mill at Isdemir
2015Control software upgrade
2015 - CSN Volta Redonda - Volta Redonda, BrazilComplete control system for 600,000 tpy bar and wire rod mill
2015 - Silat (Gerdau Group) - Caucaia, BrazilElectrical and control system engineering
2015 - Nucor Nebraska - Norfolk, NE, USAControl and drives upgrade for shears and braking slide
2015 - CMC Knoxville - Knoxville, TN, USAVertical coil handling control system upgrade
2015 - Celsa GSW - Santander, SpainControl and drives upgrade (2nd gen)
2015 - Isdemir - Iskenderun, Turkey