Projects

Nucor Steel Memphis bar mill automation upgrade
By upgrading existing hardware with technologically advanced systems, retrofitting increases automation equipment functionality and reliability.

Projects

Advanced automation at Gerdau Pindamonhangaba improves special steel billets and heavy bar cooling
The partnership between Gerdau and Russula continues in the automation of the Rolling Mill #1 cooling bed that will improve the temperature cooling for the special steel billets and heavy bars.

Projects

Russula supplies several optical alignment systems to steel plants
Russula has designed a novel guide alignment system based on artificial vision employing telecentric lenses, high-resolution cameras and Russula’s own artificial vision algorithms.

Projects
Russula improves Liberty Steel’s wire rod mill
Liberty Steel & Wire has contracted Russula to upgrade the two-strand wire plant located in Peoria, IL, USA.

Projects
CSN two-strand slab caster automation and drives upgrade
In January 2023, the CSN and Russula team commissioned the second phase of the drives and automation upgrade for the continuous slab caster.

Projects

Russula supplies 550,000 tpy wire rod mill
The start-up of the new rolling mill at the Celsa France complex in Bayonne allowed CELSA Group™ to further diversify its activity and boost its international business to invoice new growth as of next year.

Projects
Big River Steel Works
BRSW has awarded Russula the construction of one of the largest water treatment plants ever built for the metallurgical sector. The water plant is divided into 13 circuits that treat daily more than 65M l/h.

Projects
Liberty Steel & Wire improves production with Mill Pulse®
Liberty Steel and Wire implements Russula’s Manufacturing Execution System Mill Pulse®

ARCHIVES
All our
projects
Control system and drives upgrade for two strand wire mill
2005 - Celsa UK - Cardiff, UKSoftware development and HMI modification for Level 2 integration for meltshop
2005 - Celsa GSW - Santander, SpainDrives and control upgrade for increasing the mill production rate
2005 - Celsa GSW - Santander, SpainNew dividing shear control and drives
2005 - Gerdau Wilton - Wilton, IA, USAElectrical supply for new intermediate pinch rolls
2004 - ArcelorMittal Zumárraga - Zumárraga, SpainSection mill control system and drives upgrade
2004 - Gerdau Whitby - Whitby, ON, CanadaControl system for 60 ton/hr walking beam reheat furnace
2004 - Fagersta Stainless - Fagersta, Sweden
This page uses its own cookies for technical and functional purposes and third-party cookies for advertising purposes. To consent to their use and confirm that you have read the information provided, click the accept button. You can learn how to manage or disable cookies in configure cookies.