Projects
CSN two-strand slab caster automation and drives upgrade
In January 2023, the CSN and Russula team commissioned the second phase of the drives and automation upgrade for the continuous slab caster.

Projects

Russula supplies 550,000 tpy wire rod mill
The start-up of the new rolling mill at the Celsa France complex in Bayonne allowed CELSA Group™ to further diversify its activity and boost its international business to invoice new growth as of next year.

Projects

Russula supplies several optical alignment systems to steel plants
Russula has designed a novel guide alignment system based on artificial vision employing telecentric lenses, high-resolution cameras and Russula’s own artificial vision algorithms.

Projects

Nucor Steel Memphis bar mill automation upgrade
By upgrading existing hardware with technologically advanced systems, retrofitting increases automation equipment functionality and reliability.

Projects
Russula improves Liberty Steel’s wire rod mill
Liberty Steel & Wire has contracted Russula to upgrade the two-strand wire plant located in Peoria, IL, USA.

Projects
Liberty Steel & Wire improves production with Mill Pulse®
Liberty Steel and Wire implements Russula’s Manufacturing Execution System Mill Pulse®

Projects
Big River Steel Works
BRSW has awarded Russula the construction of one of the largest water treatment plants ever built for the metallurgical sector. The water plant is divided into 13 circuits that treat daily more than 65M l/h.

Projects

Gerdau Cosigua Electrical & Automation Upgrade
The first phase includes replacing control equipment and drives, spanning from reheating furnace movements to reforming.

ARCHIVES
All our
projects
New dividing shear control and drives
2005 - Gerdau Wilton - Wilton, IA, USAElectrical supply for new intermediate pinch rolls
2004 - ArcelorMittal Zumárraga - Zumárraga, SpainSection mill control system and drives upgrade
2004 - Gerdau Whitby - Whitby, ON, CanadaControl system for 60 ton/hr walking beam reheat furnace
2004 - Fagersta Stainless - Fagersta, SwedenControl and drives for a 350,000 tpy bar mill
2004 - ArcelorMittal Ares - Rodange, LuxembourgPusher reheat furnace control upgrade
2004 - Gerdau Perth Amboy - Perthy Amboy, NJ, USARoughing mill electrical upgrade for section mill
2004 - Acerinox Roldan - Ponferrada, España
This page uses its own cookies for technical and functional purposes and third-party cookies for advertising purposes. To consent to their use and confirm that you have read the information provided, click the accept button. You can learn how to manage or disable cookies in configure cookies.