Projects
Nucor Steel Memphis bar mill automation upgrade
By upgrading existing hardware with technologically advanced systems, retrofitting increases automation equipment functionality and reliability.
Projects
Liberty Steel & Wire improves production with Mill Pulse®
Liberty Steel and Wire implements Russula’s Manufacturing Execution System Mill Pulse®
Projects
Big River Steel Works
BRSW has awarded Russula the construction of one of the largest water treatment plants ever built for the metallurgical sector. The water plant is divided into 13 circuits that treat daily more than 65M l/h.
Projects
Russula supplies 550,000 tpy wire rod mill
The start-up of the new rolling mill at the Celsa France complex in Bayonne allowed CELSA Group™ to further diversify its activity and boost its international business to invoice new growth as of next year.
Projects
CSN two-strand slab caster automation and drives upgrade
In January 2023, the CSN and Russula team commissioned the second phase of the drives and automation upgrade for the continuous slab caster.
Projects
Gerdau Charqueadas Phase 3 electrical upgrade
After the successful commissioning of Phases 1 and 2 of the automation and electrical upgrade at the SBQ combined bar and wire mill in Charqueadas, Brazil, the Gerdau and Russula team successfully put into operation Phase 3 on September 6, 2023.
Projects
Russula improves Liberty Steel’s wire rod mill
Liberty Steel & Wire has contracted Russula to upgrade the two-strand wire plant located in Peoria, IL, USA.
Projects
Mill Pulse® Manufacturing Execution System implementation at Celsa Nervacero
Celsa Nervacero is currently running the Mill Pulse® Delay Tracking and Production Management and Scheduling modules.
Flagship projects
- 2023Darlington, SC, USA
Nucor Steel Memphis bar mill automation upgrade
By upgrading existing hardware with technologically advanced systems, retrofitting increases automation equipment functionality and reliability.
- 2023Kingman, AZ, USA
Nucor Kingman bar finishing mill upgrade
Obsolete automation and drives equipment will be replaced with new, modern, first line electrical equipment.
- 2023Charqueadas, Rio Grande do Sul, Brazil
Advanced automation at Gerdau Pindamonhangaba improves special steel billets and heavy bar cooling
The partnership between Gerdau and Russula continues in the automation of the Rolling Mill #1 cooling bed that will improve the temperature cooling for the special steel billets and heavy bars.
- 2023Charqueadas, Rio Grande do Sul, Brazil
Gerdau Charqueadas Phase 3 electrical upgrade
After the successful commissioning of Phases 1 and 2 of the automation and electrical upgrade at the SBQ combined bar and wire mill in Charqueadas, Brazil, the Gerdau and Russula team successfully put into operation Phase 3 on September 6, 2023.
- 2023Volta Redonda, Rio de Janeiro, Brazil
CSN two-strand slab caster automation and drives upgrade
In January 2023, the CSN and Russula team commissioned the second phase of the drives and automation upgrade for the continuous slab caster.
- 2023Bilbao, Spain
Mill Pulse® Manufacturing Execution System implementation at Celsa Nervacero
Celsa Nervacero is currently running the Mill Pulse® Delay Tracking and Production Management and Scheduling modules.
- 2022Osceola, AR, USA
Big River Steel Works
BRSW has awarded Russula the construction of one of the largest water treatment plants ever built for the metallurgical sector. The water plant is divided into 13 circuits that treat daily more than 65M l/h.
- 2019Bayonne, France
Russula supplies 550,000 tpy wire rod mill
The start-up of the new rolling mill at the Celsa France complex in Bayonne allowed CELSA Group™ to further diversify its activity and boost its international business to invoice new growth as of next year.
- 2023Peoria, IL, USA
Liberty Steel & Wire improves production with Mill Pulse®
Liberty Steel and Wire implements Russula’s Manufacturing Execution System Mill Pulse®
ARCHIVES
All our
projects
Tube mill electrical and control equipment upgrade
1998 - Celsa Atlantic Vitoria - Vitoria, SpainFlat bar mill electrical and control system upgrade
1998 - Sidenor Vitoria - Vitoria, SpainSection mill drives and control upgrade
1997 - Acerinox Roldan - Ponferrada, EspañaUpgrade control system for roughing mill for two strand wire rod mill
1997 - ArcelorMittal Acindar Villa Constitución - Villa Constitución, ArgentinaMechanical and electrical revamp for six strand continuous casting machine
1997 - Antara Steel Mills - Johor Bahru, MalaysiaSection mill electrical and control upgrade
1996 - Antara Steel Mills - Johor Bahru, MalaysiaElectrical equipment supply for flat bar mill upgrade
1996 - Celsa 4 - Barcelona, Spain
Cookies policy
Name | Purpose | Observations |
PHPSESSID | The PHPSESSID cookie is native to PHP and allows websites to store serialized status data. On the website it is used to establish a user session and to pass status data through a temporary cookie, which is commonly known as a session cookie. These Cookies will only remain on your computer until you close the browser. |
Name | Purpose | Observations |
Google analytics (__utma, __utmb, __utmc, __utmz, _ga) | These cookies are used to collect information about the use of our website by visitors. We use the information to compile reports and to improve the site. Cookies collect information anonymously, which includes the number of visitors to the site, the place of origin of the visitors' site and the pages visited. | More information in Types of cookies used by Google . |
Youtube(ACTIVITY, APISID, HSID, LOGIN_INFO, PREF, SID, VISITOR_INFO1_LIVE, YSC, demographics, dkv) | YouTube is used to provide useful videos or informational videos. Youtube stores information to be able to generate statistics on the visits of videos embedded in other pages. | More information in Types of cookies used by Google . |
Google Maps (APISID, HSID, NID, PREF, S, SAPISID, SID, SSID, S_awfe, khcookie) | Show where the offices of our different services are located using Google Maps. | More information in Types of cookies used by Google . |