Projects

Cooling Water Systems for Novelis
The cooling systems will serve the caster, hot mill, cold mill, and finishing line areas.

Projects
Liberty Steel & Wire improves production with Mill Pulse®
Liberty Steel and Wire implements Russula’s Manufacturing Execution System Mill Pulse®

Projects

Advanced automation at Gerdau Pindamonhangaba improves special steel billets and heavy bar cooling
The partnership between Gerdau and Russula continues in the automation of the Rolling Mill #1 cooling bed that will improve the temperature cooling for the special steel billets and heavy bars.

Projects
Big River Steel Works
BRSW has awarded Russula the construction of one of the largest water treatment plants ever built for the metallurgical sector. The water plant is divided into 13 circuits that treat daily more than 65M l/h.

Projects

Nucor Steel Memphis bar mill automation upgrade
By upgrading existing hardware with technologically advanced systems, retrofitting increases automation equipment functionality and reliability.

Projects
Russula improves Liberty Steel’s wire rod mill
Liberty Steel & Wire has contracted Russula to upgrade the two-strand wire plant located in Peoria, IL, USA.

Projects

Gerdau Charqueadas Phase 3 electrical upgrade
After the successful commissioning of Phases 1 and 2 of the automation and electrical upgrade at the SBQ combined bar and wire mill in Charqueadas, Brazil, the Gerdau and Russula team successfully put into operation Phase 3 on September 6, 2023.

Projects

Russula supplies several optical alignment systems to steel plants
Russula has designed a novel guide alignment system based on artificial vision employing telecentric lenses, high-resolution cameras and Russula’s own artificial vision algorithms.

Flagship projects
2024Cooling Water Systems for Novelis
The cooling systems will serve the caster, hot mill, cold mill, and finishing line areas.
2024Reverse osmosis water system for Novelis
This strategic project enables Novelis to optimize water consumption and reduce its environmental impact
2024Gerdau Cosigua Electrical & Automation Upgrade
The first phase includes replacing control equipment and drives, spanning from reheating furnace movements to reforming.
2023Charqueadas, Rio Grande do Sul, BrazilGerdau Charqueadas Phase 3 electrical upgrade
After the successful commissioning of Phases 1 and 2 of the automation and electrical upgrade at the SBQ combined bar and wire mill in Charqueadas, Brazil, the Gerdau and Russula team successfully put into operation Phase 3 on September 6, 2023.
2023Charqueadas, Rio Grande do Sul, BrazilAdvanced automation at Gerdau Pindamonhangaba improves special steel billets and heavy bar cooling
The partnership between Gerdau and Russula continues in the automation of the Rolling Mill #1 cooling bed that will improve the temperature cooling for the special steel billets and heavy bars.
2023Bilbao, SpainMill Pulse® Manufacturing Execution System implementation at Celsa Nervacero
Celsa Nervacero is currently running the Mill Pulse® Delay Tracking and Production Management and Scheduling modules.
2019Bayonne, FranceRussula supplies 550,000 tpy wire rod mill
The start-up of the new rolling mill at the Celsa France complex in Bayonne allowed CELSA Group™ to further diversify its activity and boost its international business to invoice new growth as of next year.
2022Osceola, AR, USABig River Steel Works
BRSW has awarded Russula the construction of one of the largest water treatment plants ever built for the metallurgical sector. The water plant is divided into 13 circuits that treat daily more than 65M l/h.
2023Kingman, AZ, USANucor Kingman bar finishing mill upgrade
Obsolete automation and drives equipment will be replaced with new, modern, first line electrical equipment.
ARCHIVES
All our
projects
Automation system and drives upgrade for SBQ bar mill
2013 - Special Metals - Huntington, WV, USADrives for cooling bed area
2013 - Gerdau Corsa Tultitlan - Tultitlan, MexicoAutomation system and drives upgrade for mill #1
2013 - Nucor Jewett - Jewett, TX, USA2012 - Gerdau Divinopolis - Divinópolis, MG, BrazilLevel 1 and Level 2 control for new walking hearth reheat furnace
2012 - ArcelorMittal Votorantim Siderúrgia - Barra Mansa, BrazilNew water treatment plant for meltshop, combined bar and wire rod mill
2012 - ICH (SIMEC Group) Pindamonhangaba - Pindamonhangaba, BrazilNew tension control system
2012 - Nucor Jackson - Jackson, MS, USA
This page uses its own cookies for technical and functional purposes and third-party cookies for advertising purposes. To consent to their use and confirm that you have read the information provided, click the accept button. You can learn how to manage or disable cookies in configure cookies.