Projects
Big River Steel Works
BRSW has awarded Russula the construction of one of the largest water treatment plants ever built for the metallurgical sector. The water plant is divided into 13 circuits that treat daily more than 65M l/h.

Projects
Russula improves Liberty Steel’s wire rod mill
Liberty Steel & Wire has contracted Russula to upgrade the two-strand wire plant located in Peoria, IL, USA.

Projects

Nucor Steel Memphis bar mill automation upgrade
By upgrading existing hardware with technologically advanced systems, retrofitting increases automation equipment functionality and reliability.

Projects

Cooling Water Systems for Novelis
The cooling systems will serve the caster, hot mill, cold mill, and finishing line areas.

Projects
CSN two-strand slab caster automation and drives upgrade
In January 2023, the CSN and Russula team commissioned the second phase of the drives and automation upgrade for the continuous slab caster.

Projects

Advanced automation at Gerdau Pindamonhangaba improves special steel billets and heavy bar cooling
The partnership between Gerdau and Russula continues in the automation of the Rolling Mill #1 cooling bed that will improve the temperature cooling for the special steel billets and heavy bars.

Projects

Gerdau Charqueadas Phase 3 electrical upgrade
After the successful commissioning of Phases 1 and 2 of the automation and electrical upgrade at the SBQ combined bar and wire mill in Charqueadas, Brazil, the Gerdau and Russula team successfully put into operation Phase 3 on September 6, 2023.

Projects

Gerdau Cosigua Electrical & Automation Upgrade
The first phase includes replacing control equipment and drives, spanning from reheating furnace movements to reforming.

ARCHIVES
All our
projects
Flat bar mill electrical and control system upgrade
1998 - Sidenor Vitoria - Vitoria, SpainSection mill drives and control upgrade
1997 - Acerinox Roldan - Ponferrada, EspañaUpgrade control system for roughing mill for two strand wire rod mill
1997 - ArcelorMittal Acindar Villa Constitución - Villa Constitución, ArgentinaMechanical and electrical revamp for six strand continuous casting machine
1997 - Antara Steel Mills - Johor Bahru, MalaysiaSection mill electrical and control upgrade
1996 - Antara Steel Mills - Johor Bahru, MalaysiaElectrical equipment supply for flat bar mill upgrade
1996 - Celsa 4 - Barcelona, SpainElectrical upgrade for single strand wire rod mill
1996 - Sidenor Vitoria - Vitoria, Spain
This page uses its own cookies for technical and functional purposes and third-party cookies for advertising purposes. To consent to their use and confirm that you have read the information provided, click the accept button. You can learn how to manage or disable cookies in configure cookies.