Projects
CSN two-strand slab caster automation and drives upgrade
In January 2023, the CSN and Russula team commissioned the second phase of the drives and automation upgrade for the continuous slab caster.

Projects

Russula supplies 550,000 tpy wire rod mill
The start-up of the new rolling mill at the Celsa France complex in Bayonne allowed CELSA Group™ to further diversify its activity and boost its international business to invoice new growth as of next year.

Projects
Big River Steel Works
BRSW has awarded Russula the construction of one of the largest water treatment plants ever built for the metallurgical sector. The water plant is divided into 13 circuits that treat daily more than 65M l/h.

Projects

Advanced automation at Gerdau Pindamonhangaba improves special steel billets and heavy bar cooling
The partnership between Gerdau and Russula continues in the automation of the Rolling Mill #1 cooling bed that will improve the temperature cooling for the special steel billets and heavy bars.

Projects
Liberty Steel & Wire improves production with Mill Pulse®
Liberty Steel and Wire implements Russula’s Manufacturing Execution System Mill Pulse®

Projects

Mill Pulse® Manufacturing Execution System implementation at Celsa Nervacero
Celsa Nervacero is currently running the Mill Pulse® Delay Tracking and Production Management and Scheduling modules.

Projects

Russula supplies several optical alignment systems to steel plants
Russula has designed a novel guide alignment system based on artificial vision employing telecentric lenses, high-resolution cameras and Russula’s own artificial vision algorithms.

Projects

Gerdau Cosigua Electrical & Automation Upgrade
The first phase includes replacing control equipment and drives, spanning from reheating furnace movements to reforming.

ARCHIVES
All our
projects
Electrical and automation system for 500,000 tpy wire rod mill
2007 - ArcelorMittal Votorantim Siderúrgia - Barra Mansa, BrazilElectrical system for start/stop crop shear
2007 - Gerdau St. Paul - St. Paul, MN, USAControl and HMI system for finishing area
2007 - Republic Steel Lackawanna - Buffalo, NY, USAWater treatment plant revamp for wire rod mill
2007 - Nucor Connecticut - Wallingford, CT, USAControl system upgrade for pusher reheat furnace
2007 - Kyoei Steel - Vinton, TX, USAStands DC drives upgrade
2007 - Nucor Seattle - Seattle, WA, USADrives upgrade for new stands and rod block
2007 - Gerdau Beaumont - Beaumont, TX, USANew water treatment plant for greenfield meltshop, continuous caster and wire rod mill
2007 - ArcelorMittal Votorantim Siderúrgia - Barra Mansa, Brazil
This page uses its own cookies for technical and functional purposes and third-party cookies for advertising purposes. To consent to their use and confirm that you have read the information provided, click the accept button. You can learn how to manage or disable cookies in configure cookies.