Gerdau Charqueadas Phase 3 electrical upgrade
After the successful commissioning of Phases 1 and 2 of the automation and electrical upgrade at the SBQ combined bar and wire mill in Charqueadas, Brazil, the Gerdau and Russula team successfully put into operation Phase 3 on September 6, 2023.

Projects
Liberty Steel & Wire improves production with Mill Pulse®
Liberty Steel and Wire implements Russula’s Manufacturing Execution System Mill Pulse®

Projects

Nucor Steel Memphis bar mill automation upgrade
By upgrading existing hardware with technologically advanced systems, retrofitting increases automation equipment functionality and reliability.

Projects
Russula improves Liberty Steel’s wire rod mill
Liberty Steel & Wire has contracted Russula to upgrade the two-strand wire plant located in Peoria, IL, USA.

Projects

Advanced automation at Gerdau Pindamonhangaba improves special steel billets and heavy bar cooling
The partnership between Gerdau and Russula continues in the automation of the Rolling Mill #1 cooling bed that will improve the temperature cooling for the special steel billets and heavy bars.

Projects

Russula supplies several optical alignment systems to steel plants
Russula has designed a novel guide alignment system based on artificial vision employing telecentric lenses, high-resolution cameras and Russula’s own artificial vision algorithms.

Projects

Gerdau Cosigua Electrical & Automation Upgrade
The first phase includes replacing control equipment and drives, spanning from reheating furnace movements to reforming.

Projects

Mill Pulse® Manufacturing Execution System implementation at Celsa Nervacero
Celsa Nervacero is currently running the Mill Pulse® Delay Tracking and Production Management and Scheduling modules.

ARCHIVES
All our
projects
EAF electrode regulation system
2003 - Celsa GSW - Santander, SpainAluminium hot strip mill control upgrade
2002 - Companhia Brasileira de Aluminio - São Paulo, BrazilElectrical equipment for new cold exit area
2002 - Gerdau Riograndense - Sapucaia do Sul, RS, BrazilPhase 2: Fourth stacker control and drives revamp for medium section mill
2002 - Celsa 4 - Barcelona, SpainFull electrical revamp of reheat furnaces for aluminium hot strip mill
2002 - Companhia Brasileira de Aluminio - São Paulo, BrazilControl system revamping for the bar mill
2002 - ArcelorMittal Acindar Bonelli - San Nicolás, ArgentinaThird stacker drives and control for bar and section mill
2002 - Celsa 3 - Barcelona, SpainControl system for 170 ton/hr new walking beam reheat furnace
2002 - Celsa GSW - Santander, Spain